Brief Limited Part History
August 1993 : Built blasting + painting yard at Rayong (Site area 10,000 m2, blasting 8,000 m2, painting 2,000 m2)
October 1995 : Established under the name of Blasting Group Service limited 81/14 M.6 A.Bangbuatong, Nonthaburi
October 1998 : Built blasting + painting shop at Lardloomkaew (Site area 13,000 m2, blasting 5,000 m2, painting 8,000 m2)
September 2005 : Built Fabrication shop and yard total 15,000 m2 and Blast Room 20 x 6 m. with vacuum system, at Makamku, Rayong Province.

